Liquid^2

Liquid^2

Chris arrived in the late afternoon and worked on the water. He removed well pipe back to where the last coupling was originally installed about 2 feet below the surface of the sand. He installed new pipe to the pump from there. A new 1HP pump was installed and the water seems to be working quite well now with no air intrusion or delay on start up.

Chris also mowed the yard and moved the walkways as close to the beach as he could as well as pulling the jetski lift to the beach.

Weather

It was sunny, in the upper 80’s with a light breezer out of the north.

People

Chris Uthe